1. Preparation of Detailed Project Report for Sugar Plants, Power Plants, Distillery, Etc., deals with the following
- Introduction and the general trend in the industry.
- Capability of the management to execute the project.
- Details of the cane potential in the command area.
- Concept of the project and technology proposed.
- Discussing with Your Executives to decide the macro level Plant configuration and Technical specification.
- Detailed Technical specification of the Plant & Machineries.
- Preparing the Plant Block Layout.
- Details of the material balance in the Plant especially with respect to
- Fuel.
- Steam.
- Power.
- Water.
- Flow chart of the various processes during season & off-season operations.
- Project cost estimate considering the trend in the industry and the budgetary offers received
- Preparing the project schedule.
- Water management
- Manpower Assessment and Training
- Financial Analysis.
- Recommendation.
- Consultant Profile.
- Drawings.
2. Site Selection:
Selection of site for setting up the Sugar, Power & Distillery Plants consideration of various aspects like: –
- Area required for the proposed and future expansion.
- Condition of Soils.
- Strata, Vasthu Sasthra, Climatic Conditions.
- Wind Directions, Proximity to Cane fields.
- Approach roads, rails, power, water, telecommunication facilities & Electricity Board Substation.
3. Feasibility study for cane availability and proposal for establishing cane plantation deals with the following.
- Land Clearance
- Soil analysis
- Water analysis
- Road development
- Climate and Rainfall analysis
- Irrigation infrastructure and practices
- Variety selection
- Fabrication procedures
- Harvesting and transporting systems
- Cost estimate
- Operation cost
4. Engineering Services
- Discussion with client and their Engineers about selection of technology for the Sugar and Co-generation Plant.
- Preparation of factory layout.
- Preparation of process flow diagram.
- Preparation of Steam Balance.
- Preparation of Power Balance.
- Preparation of details for TG set and Boilers.
- Preparation of Cold Water Cycle.
- Preparation of Condensate cycle.
- Preparation of Equipment specifications.
- Preparation of Equipment Layout.
- Discussion with client about the philosophy of equipment purchase.
- Preparation of Two part tender documents for floating enquiries for the supply of equipments (Technical & Commercial)
- Evaluation of technical bid of the tenders received from suppliers and recommending.
- Preparation of specification for calling Erection & Commissioning Contractors and short listing of Erection Contractors.
- Co-ordination with civil architects / civil contractors.
- Assisting in obtaining clearance from various statutory authorities.
- Help the management in recruitment of staff & labour and train them for efficient operation of the plant.
5. Project Management
- Approval of drawings.
- Preparation of project Completion Schedule for supply, erection and commissioning.
- Periodical review of the progress of equipment supplies.
- Carrying out inspection of equipment at Supplier’s work.
- Co–ordination of the commissioning of the plant.
- Trouble shooting till performance guarantee.
- Assisting the management for providing the technical support to achieve the guaranteed performance.
- Approved Energy Auditors (Approved by TNEB) for Industrial & Commercial establishments.
- Feasibility study for revamping & re-commissioning of sick sugar plant.
6. Operation and Maintenance Services
- Need based Deputation.
Deputing Experienced Executives & Technicians to cater to the needs in different departments such as Electrical, Instrumentation, Mechanical, Chemical, Sugar Technology and Sugar Engineering - Performance based O&M Operation.
Taking up the performance based functional responsibilities of Sugar plant, Cogeneration plant, Independent power plant and Distillery plant.